Tunnelling in heart of Brisbane CBD

The Challenge           

Brisbane Move, specifically the Adelaide Street tunnel, is a key part of the Brisbane Metro project for the Brisbane City Council.   A joint venture partnership led by construction company Acciona, the new 213 m tunnel built in the heart of Brisbane’s CBD, will provide a dedicated connection between the Inner Northern Busway and Southeast for metro and bus services. 

Engineering Sales - Mudbug - Silt Settlement Tanks

The Challenge
With the expansion of their national pump fleet, Shore Hire (now United Rentals) needed a reliable and effective silt settlement solution to complement their pumping operations. The tanks had to integrate seamlessly with their equipment, handle varying site conditions, and meet environmental discharge requirements, all while being readily available for their customers.

Ground Water Treatment - New Zealand

The Challenge           

City Rail Link is the largest infrastructure project ever undertaken in New Zealand and includes construction of twin 3.45 km rail tunnels up to 42 m under the Auckland CBD. 

Aquatic Engineering was engaged to design and construct a water treatment plant (WTP) for the Mercury Lane site, treating ground and construction water for discharge to stormwater. The WTP had it be designed to fit under a mezzanine and around columns of the site acoustic shed.